4D Simulations help with constructability analysis and progress monitoring. All model elements linked to the tasks in the schedule can simulate the actual construction of the facility as well as logistics and site management which helps with efficient work sequencing and material flow. Such simulations enhance project planning, minimize downtime and can even reduce the duration of the project by improving overall scheduling accuracy and reliability.


3D simulation in Flair 3D